Beynon BSS 2000

Overview

This IAAF Certified Track System can be Tuned to meet the intense demands of Olympic-Caliber competition.

 

EPDM granules are mixed throughout the full depth of the wear layer, giving your athletes superior traction and complete control.

The force reduction layer is constructed with butyl rubber and environmentally friendly Polyurethane for maximum energy return.

 

 

 

Our Action-Track® Running Tracks have beneficial characteristics:

Resilient: Our tracks retain their resiliency, regardless of the temperature.

Fast: Our tracks deliver greater energy return to the runner. They provide ultra-quick spike release, a key feature in achieving maximum athletic performance.

Safe: Water drains off through the surface, eliminating slick spots. The surface is textured and tailored to provide a high friction in both wet and dry conditions.

Durable: Our track system “breathes” to release moisture that could build-up beneath the surface – improving surface longevity.

The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision and services necessary for the proper completion of the BSS 2000 Dual Durometer synthetic track surfacing and related work indicated on the drawings and specified herein.

The synthetic surfacing contractor shall refer to the drawings for the required locations of synthetic track surfacing to be installed. All quantities and dimensions shall be field verified by the synthetic surfacing contractor.

A. Install full-depth poured-in-place two-component UV stabilized elastomeric polyurethane Dual Durometer synthetic surfacing system with encapsulated textured finish.

B. Layout and paint all track lines and event markings as required and specified nby current IAAF and NCAA rules.

Technical Specifications

BSS 2000 ENCAPSULATED DUAL DUROMETER
SYNTHETIC TRACK SURFACING SYSTEM
13 mm Thickness
SECTION 02535
SYNTHETIC TRACK SURFACING

PART 1 – GENERAL

1.1 Scope
The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision and services necessary for the proper completion of the BSS 2000 Dual Durometer synthetic track surfacing and related work indicated on the drawings and specified herein.

The synthetic surfacing contractor shall refer to the drawings for the required locations of synthetic track surfacing to be installed. All quantities and dimensions shall be field verified by the synthetic surfacing contractor.

1.2 Specific Scope of Work

  1. Install full-depth poured-in-place two-component UV stabilized elastomeric polyurethane Dual Durometer synthetic surfacing system with encapsulated
    textured finish.
    B. Layout and paint all track lines and event markings as required and specified by current IAAF and NCAA rules.

1.3 Coordination
The synthetic surfacing contractor shall coordinate the work specified with an authorized and appointed representative of the owner so as to perform the work during a period and in a manner acceptable to the owner.

PART 2 – CODES AND STANDARDS

2.1 APPLICABLE PUBLICATIONS CODES AND STANDARDS
Applicable Publications Codes and standards follow the current guidelines set forth by the International Amateur Athletic Association (IAAF), the National Collegiate Athletic Association (NCAA) along with the current material testing guidelines as published by the American Society of Testing and Materials (ASTM).

2.2 Performance Standards
The new synthetic track surfacing system shall exhibit the following minimum performance standards.

  1. Thickness Average – 12mm, Minimum – 10mm
    B. Force Reduction 35 to 50
    C. Modified Vertical Deformation 0.6 to 1.8
    D. Friction TRRL Skid Resistance ≥ 47
    E. Tensile Strength ≥ 0.5
    F. Elongation at break ≥ 40

PART 3 – QUALITY ASSURANCE

3.1 Contractor Qualifications

  1. The synthetic surfacing Contractor must have a minimum of five (5) years of experience in the installation of full-depth poured-in-place two-component elastomeric polyurethane synthetic track surfacing.
    B. The polyurethane manufacturer must have a minimum of ten (10) years of experience with the compounding of two-part polyurethane for athletic surfaces.
    C. The supervisor for the installation must have installed a minimum of five (5) full-depth two-component polyurethane tracks with encapsulated texture in the last three (3) years. A reference list must be submitted.

3.2 Submittals
The following submittals must be received with bid submittal:

  1. Standard printed specifications of the synthetic track surfacing system to be installed on this project.
    B. An affidavit attesting that the synthetic track surfacing material to be installed meets the requirements defined by the manufacturer’s currently published specifications and any modifications outlined in those technical specifications.
    C. A synthetic track surfacing sample, 12″ x 12″ in size, color, texture, thickness, etc. of the same synthetic surfacing system specified herein.
    D. A list of completed facilities, including the installing supervisor, of the exact Dual Durometer synthetic track surfacing system.

PART 4 – MATERIALS

4.1 Elastomeric Polyurethane

  1. Two-component UV stabilized elastomeric polyurethane compounded from polyol and isocyanate components. based on 100% MDI.
    B. The elastomeric polyurethane shall be red in color.

4.2 EPDM Granulate

  1. .5 to 1.5 millimeter peroxide cured EPDM granulate.
    B. The EPDM granulate shall be red in color and match the UV stabilized elastomeric polyurethane.

4.3 Rubber Granulate

  1. Red butyl rubber processed ground to a graded size not to exceed 0.5 – 1 millimeter.
    B. A maximum of twenty (20) percent, by weight, of the butyl rubber will be allowed in the force reduction layer.

4.4 Aliphatic Coating

  1. Two-component aliphatic coating.
    B. Aliphatic coating shall be red in color matching the UV stabilized elastomeric polyurethane.
    C. No clear coatings will be allowed.

4.5 Line Marking Paint
Two-component aliphatic paint.

PART 5 – INSTALLATION

5.1 Subbase
The synthetic track surfacing system shall be laid on an approved subbase. The General Contractor shall provide compaction test results of 95% or greater for the installed subbase and asphalt surface.

For NCAA and IAAF certification tire following criteria must be followed: The track surface, i.e. asphalt substrate, shall not vary from planned cross slope by more than 1% with a maximum lateral scope outside to inside of 1% and maximum slope of 1% in any running direction. The finished asphalt shall not vary under a 10′ straightedge more than 1/8″.

It should be the responsibility of the asphalt paving contractor to flood the surface immediately after the asphalt is capable of handling traffic, but within 24 hours. If, after 20 minutes of drying time, there are birdbaths evident, it shall be the responsibility of the architect, in conjunction with the surfacing contractor, to determine the method of correction. No cold tar patching, skin patching or sand mix patching will be acceptable.

Any oil spills (hydraulic, diesel, motor oil. etc.) must be completely removed and replaced with either polyurethane or new, keyed in asphalt. The minimum
curing time for the asphalt base is 28 days. It shall be the responsibility of the surfacing contractor to determine if the asphalt substrate has cured sufficiently prior to the application of the polyurethane surfacing system.

It shall be the responsibility of the general contractor to determine if the asphalt substrate meets all design specifications, i.e. cross slopes, planarity and specific project criteria. After all the above conditions are met. the synthetic surfacing contractor must, in writing, accept the planarity of the asphalt-receiving base, before work can commence.

5.2 Thickness
Total thickness of the BSS 2000 Dual Durometer synthetic track surfacing system shall average 13mm.

5.3 Equipment
The BSS 2000 Dual Durometer synthetic track surfacing system components shall be processed and installed by specially designed machinery with automatic
electronic portioning. which provides continuous mixing, feeding and finishing for accurate quality controlled installation. No hand mixing will be allowed.

5.4 Materials
A. Force Reduction Layer
The red butyl granules and UV stabilized elastomeric polyurethane shall be metered and mixed together on site to regulate the ratio/quantity of butyl, not to exceed fourteen (14) percent in the system and to insure an even distribution of the granules throughout the Brew force reduction layer. No multi. layered system allowed.

  1. Resilient Wearing Layer
    The .5 to t.5 millimeter EPDM granules shall be mechanically integrated with an UV stabilized elastomeric polyurethane to the full-depth of the 5mm wearing
    layer. The resilient textured finish shall be a dense matrix of encapsulated EPDM granules.

No structural spray applications of any type will be allowed.

  1. Protective Coating
    The initial red-pigmented aliphatic polyurethane coating shall be spray applied over the entire synthetic surfaced area at a rate of 125 square feet per gallon.

The second red-pigmented aliphatic polyurethane coating shall be spray applied over the initial application at a rate of 125 square feet per gallon in the opposite direction.

5.5 Site Conditions

  1. Installation shall not take place if adjacent or concurrent construction generates excessive dust, abrasives or any other byproduct that, in the opinion of the installer, would be harmful to the track material, until completion of such works.
    B. If, in the opinion of the installer of the synthetic material, the weather and/or climatic conditions are detrimental to the proper installation of the surfacing materials, work shall be delayed until conditions are acceptable.

Preferred installed temperature is 50 degrees F and rising. Installation shall be executed only in dry conditions.

PART 6 – LINE STRIPPING AND EVENT MARKINGS

6.1 Layout
Line stripping and event markings shall be laid out in accordance with current IAAF and NCAA rules.

6.2 Certification
Upon completion the owner shall be supplied with all necessary computations and drawings as well as a letter of certification attesting to the accuracy of the
markings.

PART 7 – GUARANTEE
Synthetic track surfacing system shall be fully guaranteed against faulty workmanship and material failure for a period of five (5) years from the date of acceptance.

Synthetic surfacing material found to be defective as a result of faulty workmanship and/or material failure shall be replaced or repaired at no charge, upon written notification within the guarantee period.

 

Imagine installing a product as friendly to install as an asphalt based beautifier with a lot of the same strengths as a coal tar based sealer.   Action-Pave LP Base Sealer
In this installment, Copeland provided USTA Eastern a step-by-step view of a recent court repair and resurfacing project at Katonah Memorial Park in Katonah, NY. Please check out the PDF of the full article!

Over the past 15 years, RDA Landscape Architects
has successfully worked with your company on a myriad of Long Island school
running track and tennis court surfacing projects. I am always impressed with
the way you respond to us, whether it is to provide an in-depth review of
existing conditions, prepare cost estimates or ensure a surfacing project moves
swiftly and smoothly from start to finish. We breathe easier when you are on
the job and we will continue to recommend Copeland Coating to our Clients for
quality and timely work.

Bob Retnauer RLA

LBMC has been a satisfied customer of Copeland Coating for
over 20 years

The service is both reliable and timely

Copeland Coating is synonymous with playing services
in Wayne County Camping

Dan Kagan Bryn Mawr Camp

Track & Field has always been a major part of my life.  I was an athlete from a young age growing up in New York and now a Master official and high school track & field coach.  Never did I imagine that I would have the ability and opportunity to build a track & field facility.

Every detail was planned carefully.  It was very important to me to choose the correct workers and companies that would make my dream a reality.  Most of the workers were local with many being Bethel track & field alumni and families.  When it came to choosing a track surfacing company, the choices were many, but one significantly stood out from the rest….Action Track Surfacing.

My first meeting with Steve Hinding & Doug Stone left me with an impression of honesty and commitment, as well as superior knowledge and expertise.   They listened carefully to my desires and needs. They offered suggestions and a well organized plan to accomplish my goal.  They were as concerned with completing a high quality track facility as I was.  Every question was met with a timely answer.  There were no hidden costs.  The project was completed in the contracted budget with no surprises.  Their crews worked perfectly with in the time table.  They were clean, hard working and professional…even to the point of cutting a slot drain on their hands and knees to meet the desired design!  Steve has been back several times to check the quality of his work.  Action Track has made sure that I am completely satisfied with the project.  

 Each day I arrive at the facility it takes my breath away.  The beautiful 8 lane track, javelin runway, and sealed walkways, all completed by Action Track Surfacing, have given my team and the town of Bethel a first class track & field facility!  I would highly recommend their services for all track & field surfacing needs.

Bethel Track

It is my pleasure to recommend the services of Copland Coating. During the past fifteen years, we have worked with Copland on numerous projects. These projects included resurfacing our twelve tennis courts as well.

Copland offers top-notch quality, service and rates. They have demonstrated their attention to detail and skill. When it comes to applying recreational surfaces, I cannot think of a better company to work with. I would highly recommend Copland for the job and look forward to working with them in the future.

Larry Siegel French Woods

Over the past 20 years our camps have worked with Copeland Coating to meet our surfacing needs. Steve and the team at Copeland have consistently exceeded expectation in helping to recondition our sport courts and to build new facilities including our hockey rink and tennis courts. I highly recommend them and look forward to working with Copeland in the future.

Marc Honigfeld Trail's End Camp

Our company has been doing business with Copeland Coatings for over twenty-five years. They complete all of our projects on time and on budget. We have never had a quality control problem with their work. They are professionals in their field. I give Copeland Coatings my highest recommendation.

Tom Vandish Bast Hatfield

Island Lake has employed Copeland Coating for over 25 years. We have found them to be professional and a quality provider of court surfacing. They are consistently on time and perform as expected. We wouldn’t look anywhere else for this service.

Matt Stoltz Island Lake Camp

I would like it to be known that Copeland Coating is a wonderful company to do business with. I am the Head Tennis Coach at Bard College and have had dealings with Copeland in the person of Steve Puzio over these past 20 years. We have used Copeland as our “got to” company for all our court needs. Our six courts have been resurfaced twice. Steve was involved personally from start to completion both times. He came first to advise and determine our needs, followed by a quote.

He made himself accessible always and we eagerly walked the job after the courts dried to insure our total satisfaction. Copeland allowed us to commit to an acceptable time frame for the job. We were always treated respectfully and fairly. Their many years of experience proved invaluable as their advice was always “spot on”. I feel that they are the best in the business. I am sure you will agree.

Bard College

Just a quick note to thank you once again for the terrific job you did with our courts this spring. Over the past 15 years we have enjoyed the relationship with you and Copeland Coating, and have come to trust your judgement and expertise. You have always communicated timely with us, finished your work ahead of schedule, and the quality of work is impeccable.

We look forward to many more years together – see you at Tri-State.

Mark Newfield Owner/Director, Iroquois Springs

We are thrilled with the work that Copeland Coating has done for us over the past several years. Their customer service is great and they deliver as promised. They have a solution to every challenge, whether it’s a new project or a minor repair.

Josh Corpuel Camp Wayne