Beynon BSS 1000

Overview

Sharp, precise markings and a seamless surface make this system ideal for world-class competition.

EPDM granules are mixed throughout the top wear to ensure traction over the life of your system. The force reduction layer provides the shock absorption necessary to meet the rigorous demands of the IAAF performance specifications. Available in 10mm or 13mm thickness. This system can be Tuned to match the needs and desires of your athletes and coaching staff.

 

 

Our Action-Track® Running Tracks have beneficial characteristics:

Resilient: Our tracks retain their resiliency, regardless of the temperature.

Fast: Our tracks deliver greater energy return to the runner. They provide ultra-quick spike release, a key feature in achieving maximum athletic performance.

Safe: Water drains off through the surface, eliminating slick spots. The surface is textured and tailored to provide a high friction in both wet and dry conditions.

Durable: Our track system “breathes” to release moisture that could build-up beneath the surface – improving surface longevity.

The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision and services necessary for the proper completion of the BSS 1000 Dual Durometer synthetic track surfacing and related work indicated on the drawings and specified herein.

The synthetic surfacing contractor shall refer to the drawings for the required locations of synthetic track surfacing to be installed. All quantities and dimensions shall be field verified by the synthetic surfacing contractor.

A. Install full-depth poured-in-place two-component UV stabilize delastomeric polyurethane Dual Durometer synthetic surfacing system with embedded textured finish.

B. Layout and paint all track lines and event markings as required and specified by current IAAF and NCAA rules.

Technical Specifications

BSS 1000 EMBEDDED DUAL DUROMETER SYNTHETIC TRACK SURFACING SYSTEM
13 mm Thickness
SECTION 02535
SYNTHETIC TRACK SURFACING

PART 1 – GENERAL

1.1 SCOPE
The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision and services necessary for the proper completion of the BSS 1000 Dual Durometer synthetic track surfacing and related work indicated on the drawings and specified herein.

The synthetic surfacing contractor shall refer to the drawings for the required locations of synthetic track surfacing to be installed. All quantities and dimensions shall be field verified by the synthetic surfacing contractor.

1.2 SPECIFIC SCOPE OF WORK

  1. Install full-depth poured-in-place two-component UV stabilize delastomeric polyurethane Dual Durometer synthetic surfacing system with embedded textured finish.
    B. Layout and paint all track lines and event markings as required and specified by current IAAF and NCAA rules.

1.3 COORDINATION
The synthetic surfacing contractor shall coordinate the work specified with an authorized and appointed representative of the owner so as to perform the work during a period and in a manner acceptable to the owner.

PART 2 – CODES AND STANDARDS

2.1 APPLICABLE PUBLICATIONS CODES AND STANDARDS
Applicable Publications Codes and standards follow the current guidelines set forth by the International Amateur Athletic Association (IAAF). the National Collegiate Athletic Association (NCAA) along with the current material testing guidelines as published by the American Society of Testing and Materials (ASTM).

2.2 PERFORMANCE STANDARDS
The new synthetic track surfacing system shall exhibit the following minimum performance standards.

  1. Thickness Average – 12mm, Minimum – 10mm
    B. Force Reduction 35 to 50
    C. Modified Vertical Deformation 0.6 to 1.8
    D. Friction TRRL Skid Resistance ≥ 47
    E. Tensile Strength ≥ 0.5
    F. Elongation at break ≥ 40

PART 3 – QUALITY ASSURANCE

3.1 CONTRACTOR QUALIFICATIONS

  1. The synthetic surfacing contractor must have a minimum of five (5) years of experience in the installation of full-depth poured-in-place two-component elastomeric polyurethane synthetic track surfacing.
    B. The polyurethane manufacturer must have a minimum of ten (10) years of experience with the compounding of two-part polyurethane for athletic surfaces.
    C. The supervisor for the installation must have installed a minimum of five (5) full-depth two-component polyurethane tracks with embedded texture in the last 3 years.

A reference list must be submitted.

3.2 SUBMITTALS
The following submittals must be received with bid submittal:

  1. Standard printed specifications of the synthetic track surfacing system to be installed on this project.
    B. An affidavit attesting that the synthetic track surfacing material to be installed meets the requirements defined by the manufacturer’s currently published specifications and any modifications outlined in those technical specifications.
    C. A synthetic track surfacing sample, 12″ x 12″ in size, color, texture, thickness, etc. of the same synthetic surfacing system specified herein.
    D. A list of completed facilities, including the installing supervisor, of the exact Dual Durometer synthetic track surfacing system.

PART 4 – MATERIALS

4.1 ELASTOMERIC POLYURETHANE

  1. Two-component UV stabilized elastomeric polyurethane compounded from polyol and isocyanate components. based on 100% MOI.
    B. The elastomeric polyurethane shall be red in color.

4.2 EPDM GRANULATE

  1. 1 to 3 millimeter peroxide cured EPDM granulate.
    B. The EPDM granulate shall be red in color and match the UV stabilized elastomeric polyurethane.

4.3 RUBBER GRANULATE

  1. Fine mesh Styrene Butadiene Rubber (SBR) processed ground to a graded size not to exceed 20 mesh in size.
    B. A maximum of twenty (20) percent, by weight of the SBR will be allowed in the force reduction layer.

4.4 LINE MARKING PAINT
Two-component aliphatic paint.

PART 5 – INSTALLATION

5.1 SUBBASE
The synthetic track surfacing system shall be laid on an approved subbase. The General Contractor shall provide compaction test results of 95% or greater for the installed subbase and asphalt surface.

For NCAA and IAAF certification the following criteria must be followed: The track surface. i.e. asphalt substrate. shall not vary from planned cross slope by more than 1% with a maximum lateral scope outside to inside of 1% and maximum slope of 1% in any running direction. The finished asphalt shall not vary under a 10′ straightedge more than 1/8″.

It should be the responsibility of the asphalt paving contractor to flood the surface immediately after the asphalt is capable of handling traffic, but within 24 hours. If. after 20 minutes of drying time, there are birdbaths evident, it shall be the responsibility of the architect, in conjunction with the surfacing contractor, to determine the method of correction. No cold tar patching, skin patching or sand mix patching will be acceptable.

Any oil spills (hydraulic, diesel, motor oil, etc.) must be completely removed and replaced with either polyurethane or new, keyed in asphalt. The minimum curing time for the asphalt base is 28 days. It shall he the responsibility of the surfacing contractor to determine if the asphalt substrate has cured sufficiently prior to the
application of the polyurethane surfacing system.

It shall be the responsibility of the general contractor to determine if the asphalt substrate meets all design specifications, i.e. cross slopes, planarity and specific project criteria. After all the above conditions are met, the synthetic surfacing contractor must, in writing, accept the planarity of the asphalt-receiving base, before work can commence.

5.2 THICKNESS
Total thickness of the BSS 1000 Dual Durometer synthetic track surfacing system shall average 13mm.

5.3 EQUIPMENT
The BSS 1000 Dual Durometer synthetic track surfacing system components shall be processed and installed by specially designed machinery with automatic electronic portioning, which provides continuous mixing, feeding and finishing for accurate quality controlled installation.

5.4 MATERIALS
A. Force Reduction Layer
The fine mesh SBR granules and UV stabilized elastomeric polyurethane shall be metered and mixed together on site to regulate the ratio/quantity of SBR. not
to exceed fourteen (14) percent in the system and to insure an even distribution of the granules throughout the 8mm force reduction layer. No multi-layered system allowed.

  1. Resilient Wearing Layer
    The 1 to 3 millimeter EPDM granules shall be mechanically integrated with an UV stabilized elastomeric polyurethane to the full-depth of the 5mm wearing layer.
    The resilient textured finish shall be a dense matrix of embedded EPDM granules.

5.5 SITE CONDITIONS

  1. Installation shall not take place if adjacent or concurrent construction generates excessive dust, abrasives or any other byproduct that, in the opinion of the installer, would be harmful to the track material, until completion of such works.
    B. If, in the opinion of the installer of the synthetic material, the weather and/or climatic conditions are detrimental to the proper installation of the surfacing materials, work shall be delayed until conditions are acceptable. Preferred installed temperature is 50 degrees F and rising. Installation shall be executed only in dry conditions.

PART 6 – LINE STRIPPING AND EVENT MARKINGS

6.1 LAYOUT
Line stripping and event markings shall be laid out in accordance with current IAAF and NCAA rules.

6.2 CERTIFICATION
Upon completion the owner shall be supplied with all necessary computations and drawings as well as a letter of certification attesting to the accuracy of the markings.

PART 7 – GUARANTEE

Synthetic track surfacing system shall be fully guaranteed against faulty workmanship and material failure for a period of five (5) years from the date of acceptance.

Synthetic surfacing material found to be defective as a result of faulty workmanship and/or material failure shall be replaced or repaired al no charge, upon written notification within the guarantee period.

Photo Gallery

Job References

Millburn High School
Installed 2006
Millburn, NJ
Theodore D’ Alessio
973-376-3600

Riverdell High School
Installed 2005
Oradell, NJ
Dennis Nelson
201-599-7201

Wallkill Valley Regional High School
Installed 2007
Hamburg, NJ
Mike Van Zile
973-827-4100

Mahwah High School
Installed 2007
Mahwah, NJ
Roger Pelletier
201-882-2301

SUNY Farmingdale
Farmingdale, NY
Installed 2008
Michael Harrington
631-420-2245

Middletown High School
Installed 2008 (IAAF Certified)
Middletown, NY
David Coates
845-326-1530

Deerfield Academy
Installed 2008
Deerfield, MA
Chip Davis
413-774-1430

University of Connecticut
Installed 2008 (NCAA Certified)
Storrs, CT
Lou Goetz – 860-486-5004
Sally Ann Beaudet – 860-486-5755

Hotchkiss School
Installed 2009
Lakeville, CT
Timothy Schilling
860-435-0335

Shenendehowa High School
Installed 2009

Imagine installing a product as friendly to install as an asphalt based beautifier with a lot of the same strengths as a coal tar based sealer.   Action-Pave LP Base Sealer
In this installment, Copeland provided USTA Eastern a step-by-step view of a recent court repair and resurfacing project at Katonah Memorial Park in Katonah, NY. Please check out the PDF of the full article!

Vassar College has experienced a very good working relationship with Copeland Coating during the past 8 years. We currently have 3 separate tiers of courts consisting of; 6 varsity courts in the north tier, 3 campus use courts in the center tier and 4 campus/local community use courts in the south tier.

Copeland management and their front line crew have always responded in a timely manner and have worked under very tight schedules to prepare our courts for the fall tennis season. They reconfigured our center tier from 4 to 3 doubles courts per a request from the tennis coaching staff with excellent results and have coated our south tier courts in a manner that will lengthen the useful life even though major renovation work is clearly needed.
I can confidently recommend Copeland Coating for tennis court re-coating and overall renovation work and should add that they are very competitive in their pricing.

Jeff Horst Vassar College

Our company has been doing business with Copeland Coatings for over twenty-five years. They complete all of our projects on time and on budget. We have never had a quality control problem with their work. They are professionals in their field. I give Copeland Coatings my highest recommendation.

Tom Vandish Bast Hatfield

LBMC has been a satisfied customer of Copeland Coating for
over 20 years

The service is both reliable and timely

Copeland Coating is synonymous with playing services
in Wayne County Camping

Dan Kagan Bryn Mawr Camp

Track & Field has always been a major part of my life.  I was an athlete from a young age growing up in New York and now a Master official and high school track & field coach.  Never did I imagine that I would have the ability and opportunity to build a track & field facility.

Every detail was planned carefully.  It was very important to me to choose the correct workers and companies that would make my dream a reality.  Most of the workers were local with many being Bethel track & field alumni and families.  When it came to choosing a track surfacing company, the choices were many, but one significantly stood out from the rest….Action Track Surfacing.

My first meeting with Steve Hinding & Doug Stone left me with an impression of honesty and commitment, as well as superior knowledge and expertise.   They listened carefully to my desires and needs. They offered suggestions and a well organized plan to accomplish my goal.  They were as concerned with completing a high quality track facility as I was.  Every question was met with a timely answer.  There were no hidden costs.  The project was completed in the contracted budget with no surprises.  Their crews worked perfectly with in the time table.  They were clean, hard working and professional…even to the point of cutting a slot drain on their hands and knees to meet the desired design!  Steve has been back several times to check the quality of his work.  Action Track has made sure that I am completely satisfied with the project.  

 Each day I arrive at the facility it takes my breath away.  The beautiful 8 lane track, javelin runway, and sealed walkways, all completed by Action Track Surfacing, have given my team and the town of Bethel a first class track & field facility!  I would highly recommend their services for all track & field surfacing needs.

Bethel Track

Copeland Coating has been a very reliable
company for us over the years.


When we have had projects, they work hard to make sure all our questions


and concerns have been met. Their work crews have always been reliable and


the work has been completed on time. The end product has always been


outstanding.


We continue to use Copeland Coating and strongly recommend them.

Rensselaer Youth Bureau

Camp Starlight has been dealing with Copeland Coating for many years. We have used Copeland for all of our sports courts including tennis, basketball, and gymnasium surfaces. The work has always been of a very high quality and they have always been very responsive to any of our requests. Even in times of inclement weather Copeland has always worked overtime to get the job completed on schedule. I would have no hesitation in recommending Copeland Coating to any camp.

David Miller Starlight Camp

The Copeland Coating Company has been successfully maintaining all of the sport surfaces at the Rocking Horse Ranch Resort for over 20 years (which is a testimony unto itself).

At each winter’s end, we contemplate the complete overhaul of our 40 year old exterior tennis courts , the crew at Copeland manages the near impossible in extending the life of these courts for yet another full season with their time tested re-coating process.

We maintain a high profile family resort that earns the prestigious 3 Diamond Travel Award every year. It is critical that wherever our guests are on our 500 acre facility, they experience an extremely well maintained, family friendly resort property.

Thank you Copeland Coating for being part of our facility management team.

Rocking Horse Ranch

Copeland coating goes the extra coating when it comes to great customer service. For 12 years it’s been a straight set victory for our member tennis courts!

Sportsplex

I would like it to be known that Copeland Coating is a wonderful company to do business with. I am the Head Tennis Coach at Bard College and have had dealings with Copeland in the person of Steve Puzio over these past 20 years. We have used Copeland as our “got to” company for all our court needs. Our six courts have been resurfaced twice. Steve was involved personally from start to completion both times. He came first to advise and determine our needs, followed by a quote.

He made himself accessible always and we eagerly walked the job after the courts dried to insure our total satisfaction. Copeland allowed us to commit to an acceptable time frame for the job. We were always treated respectfully and fairly. Their many years of experience proved invaluable as their advice was always “spot on”. I feel that they are the best in the business. I am sure you will agree.

Bard College

I have had the privilege of working closely with Copeland Coating Company over the years in the development of our tennis facilities at Saratoga Springs High School and Middle School.

I have always found them to be easy to work with during and after the completion of their work. They were always available to advise when needed. They are the best at what they do and I highly recommend them!

Rich Johns Tennis