Action-Track 100 Full Depth Color

Overview

Our Action-Track® Running Tracks have beneficial characteristics:

Resilient: Our tracks retain their resiliency, regardless of the temperature.

Fast: Our tracks deliver greater energy return to the runner. They provide ultra-quick spike release, a key feature in achieving maximum athletic performance.

Safe: Water drains through the surface, eliminating slick spots. The surface is textured and tailored to provide high friction in both wet and dry conditions.

Durable: Our track system “breathes” to release moisture that could build-up beneath the surface – improving surface longevity.

The intent of this specification is to provide a guideline for the improvement of a previously sound bituminous concrete sub-base. Action-Track 100 Full Depth Color is a vented running track surface consisting of a urethane bound EPDM rubber base mat, IN FULL DEPTH COLOR

The work covered by this specification consists of furnishing all labor, equipment, materials and performance of all operations in connection with the installation of the surface on track and field events.

Technical Specifications

Resilient Polyurethane Track Surface

Technical Data

1. Purpose
The intent of this specification is to provide a guideline for the improvement of a previously sound bituminous concrete sub-base. Action-Track 100 Full Depth Color is a vented running track surface consisting of a urethane bound EPDM rubber base mat, IN FULL DEPTH COLOR.

2. Scope
The work covered by this specification consists of furnishing all labor, equipment, materials and performance of all operations in connection with the installation of the surface on track and field events.

3. Materials

  • Action-Track Polyurethane Primer
  • EPDM Rubber Base Mat Granulate, 1 mm to 3mm or 1 mm to 4mm rubber containing no dust. (Full Depth Color.)
  • 100% polyurethane base mat binding agent tinted to match color of EPDM rubber
  • Polyurethane Line Marking Paint

 4. Surface Preparation

  • After a suitable soil sterilant, a recommended bottom course shall consist of 4″ to 8″ of compacted crushed stone, gravel, or suitable aggregate over a firm, stable frost-free sub-grade which has been brought to proper contour and elevation in strict accordance with drawings and/or specifications, and compacted to 95% density.
  • A binder-leveling course of an open-textured bituminous concrete (maximum stone size of 3/4″) is laid upon the prepared bottom course to a compacted thickness of 2.5″.
  • The wearing (top) bituminous concrete course consists of 3/8″ maximum aggregate to a thickness of 1.5″ compacted.

5. Planarity and Slope
Before application of the surface course the receiving surface should be checked for proper planarity and slope. All corrective work shall be performed to provide a safe, functional and well draining surface. For cross slope and inclination tolerances please refer to the appropriate governing body (NFSHA, NCAA, IAAF)

6. Procedure

  • Following inspection of asphalt base and required curing time, the entire area to be surfaced shall be thoroughly cleaned, removing any foreign and loose material.
  • Action-Track Polyurethane Primer will then be applied to the entire surface uniformly at a rate of not less than .3 lbs. pee sq. yd. Allowing a minimum of 30 minutes curing time before the application of the base mat material.
  • The base mat will consist of an 18 to 23% range polyurethane base mat binding agent and 77 to 82% range EPDM rubber base mat granulate as described above. This mixture is prepared in a mechanical mixer which is clean and dry. The base mat is applied with a mechanically operated screed machine which has an electrically heated screed. All joint work will be flush with the adjacent mat. Joints which have cured will have their edges primed with Action-Track Polyurethane Primer (base mat is full depth color).

7. Minimum Physical Properties Of The Surface

  • Thickness: 1/2″ or as specified by architect or engineer
  • Hardness: (ASTM D2240): Shore A @ 70°F – 50 to 60, @ 140°F – 45 to 55, @ 35°F – 55 to 65 – ELONGATION (ASTM D412): 95%
  • Tensile Strength (ASTM D412): 200 psi @ 70°F over a 24 hour period
  • Abrasion Resistance (ASTM D501): 0.25 TO 0.425 grams’ loss after 1000 cycles
  • Chalking (ASTM D822): No change after 1000 hours in weatherometer
  • Coefficient of Friction (ASTM D1 894): Dry- 0.70 to 0.7 • Wet- 0.80 to 0.95
  • Resilience (ASTM D2632): 37 TO 44%
  • Tear Resistance ASTM D624): 50 TO 75 PSI

8. Line Marking
The measurement and marking of the lines and events will be performed according to the recommendations of Copeland Coating Company and/or in accordance with the drawings and specifications of the architect or engineer and/or in accordance with N.F.H.S.A., I.A.A.F. regulations. Polyurethane Line Paint to be used.

9. Colors Available:
Red, Blue, Green Additional colors available upon request (Full depth colored base mat)

Job References

Elwood Enified School District (Suffolk County)
John Glenn High School
Action-Track 100 red – installed 1989 – resurfaced 1999
Mr Carl Fraser – Business Agent
631-266-5404

Wallkill High School (Ulster County)
Action-Track 100 blue – installed 1990
Bill Chesser
845-895-1950

Imagine installing a product as friendly to install as an asphalt based beautifier with a lot of the same strengths as a coal tar based sealer.   Action-Pave LP Base Sealer
In this installment, Copeland provided USTA Eastern a step-by-step view of a recent court repair and resurfacing project at Katonah Memorial Park in Katonah, NY. Please check out the PDF of the full article!

Vassar College has experienced a very good working relationship with Copeland Coating during the past 8 years. We currently have 3 separate tiers of courts consisting of; 6 varsity courts in the north tier, 3 campus use courts in the center tier and 4 campus/local community use courts in the south tier.

Copeland management and their front line crew have always responded in a timely manner and have worked under very tight schedules to prepare our courts for the fall tennis season. They reconfigured our center tier from 4 to 3 doubles courts per a request from the tennis coaching staff with excellent results and have coated our south tier courts in a manner that will lengthen the useful life even though major renovation work is clearly needed.
I can confidently recommend Copeland Coating for tennis court re-coating and overall renovation work and should add that they are very competitive in their pricing.

Jeff Horst Vassar College

Island Lake has employed Copeland Coating for over 25 years. We have found them to be professional and a quality provider of court surfacing. They are consistently on time and perform as expected. We wouldn’t look anywhere else for this service.

Matt Stoltz Island Lake Camp

Copeland Coating has been resurfacing tennis, basketball, and volleyball courts at Camp Scatico for more than 25 summers. They’ve completed every project on time and on budget. What more can you ask for?

Scatico Camp

Copeland Coating Company has been Schodack Schools preferred pavement coating Systems Company for over 20 years. Copeland has continued to support the school in proper care of the coating, repair and budgeting. Copeland provides durable long lasting coatings professionally installed and supported for the life of the project.

Schodack Schools

The Copeland Coating Company has been successfully maintaining all of the sport surfaces at the Rocking Horse Ranch Resort for over 20 years (which is a testimony unto itself).

At each winter’s end, we contemplate the complete overhaul of our 40 year old exterior tennis courts , the crew at Copeland manages the near impossible in extending the life of these courts for yet another full season with their time tested re-coating process.

We maintain a high profile family resort that earns the prestigious 3 Diamond Travel Award every year. It is critical that wherever our guests are on our 500 acre facility, they experience an extremely well maintained, family friendly resort property.

Thank you Copeland Coating for being part of our facility management team.

Rocking Horse Ranch

Camp Starlight has been dealing with Copeland Coating for many years. We have used Copeland for all of our sports courts including tennis, basketball, and gymnasium surfaces. The work has always been of a very high quality and they have always been very responsive to any of our requests. Even in times of inclement weather Copeland has always worked overtime to get the job completed on schedule. I would have no hesitation in recommending Copeland Coating to any camp.

David Miller Starlight Camp

Camp Seneca Lake has been in business for over 30 years and we have used hundreds of vendors over the years. Copeland Coatings is by far one of the most reliable companies we have ever dealt with. The standard of their work is top notch and they are a pleasure to work with. We look forward to many more years of completing great projects together!

Ross Zuckerman Seneca Lake Camp

Whenever there is any court resurfacing, repair or painting the only company I have ever used is Copeland Coating. I have found them to reliable, professional and reasonable with regards to pricing.

Fred & Ross Moskowitz Camp Westmont

It is my pleasure to recommend the services of Copland Coating. During the past fifteen years, we have worked with Copland on numerous projects. These projects included resurfacing our twelve tennis courts as well.

Copland offers top-notch quality, service and rates. They have demonstrated their attention to detail and skill. When it comes to applying recreational surfaces, I cannot think of a better company to work with. I would highly recommend Copland for the job and look forward to working with them in the future.

Larry Siegel French Woods

We have worked with Copland Coating for well over twenty years. There work is outstanding and they stand by the what they do. John and Steve have always been responsive to our needs. Copland is a 1st rate organization.

Dave Tager Indian Head Camp