3600 US Route 20
PO Box 595
Nassau, NY 12123

Phone No: (518) 766-2932
(800) 303-4219
Fax: (518) 766-3603
E-mail: actionpave@copelandcoating.com

The Pavement Maintenance People Since 1945

  • Home
  • About Us
    • Company History
    • Employee Profiles
    • Action Track Reference List
  • Running Tracks
    • Action Track 100
    • Action Track 200
    • Action Track 300
    • Action Track 400
    • Action Track 800
    • BSS 1000
    • BSS 2000
    • Traction Top 200
    • Action Track Vented Latex
  • Recreational Surfaces
    • Tennis/Basketball
      • Action Pave Acryllic Surfaces
      • Premier Court
      • ARMOR Crack Repair System
    • Hockey/Inline Skating
      • Action Pave Acryllic Surfaces
    • Children's Play Surfaces
  • Pavement Maintenance
    • Pavement Maintenance Products
    • One Coat Application
    • Two Coat Application
    • Three Coat Application
    • Hot Pour Crack Sealing
    • Linestriping
  • Decorative & High Friction Road Surfaces
    • Safe-T-Grip
    • TrafficPrint
    • TrafficGrip
  • Bulk Materials & Manufacturing
    • Bulk Sealer
      • Bulk Sealer Products
      • Bulk Sealer Technical Data
    • Bulk Athletic Surfacing Paints
      • Athletic Surface Products
      • Athletic Surface Filler
      • Athletic Surface Finish
      • Athletic Surface Technical Data
  • Technical Specs
  • Contact Us
 

ACTION PAVE ACRYLIC
COLOR COATING PRODUCTS

To be applied to tennis, basketball, volleyball, handball, badminton and shuffleboard courts, hopscotch, running tracks and any other recreational surfaces.

ACTION PAVE ACRYLIC CRACK AND LEVELING BINDER PATCH
A super durable acrylic emulsion specifically designed for mixing with mineral aggregate (silica sand) and portland cement to patch cracks, level low spots and smooth paving joints and other surface irregularities.

ACTION PAVE ACRYLIC RESURFACER
Designed to be the filler coat over new asphalt courts or on pitted, oxidized, older surfaces and in cases where the porosity of the pavement necessitates filling and smoothing.

ACTION PAVE ACRYLIC FILLER
Consists of 100% acrylic emulsions, mineral fillers, special reinforcing pigments and pure silica sand that is applied over the ACTION PAVE ACRYLIC RESURFACER or directly to existing color coated surfaces to provide a uniform and controlled pigmented texture.

ACTION PAVE ACRYLIC FINISH
The final coat applied to the surface. This 100% acrylic emulsion provides added durability and protects the surface against the sun's damaging ultraviolet rays.

ACTION PAVE ACRYLIC CUSHION AND SUPER CUSHION
If you are looking for added resiliency ACTION PAVE CUSHION is the answer. 100% acrylic, with special granulated rubber particles, our three (3) coat CUSHION SYSTEM is softer and easier to play on for extended periods of time.

For those of you who demand "The Ultimate" ACTION PAVE SUPER CUSHION is a five (5) coat system with unsurpassed shock absorption to cut down on leg injuries and reduce overall tennis fatigue. Utilizing a larger gradation of rubber particles on coats 1, 2 and 3, we build the overall thickness to approximately 1/8" to 1/4". Unquestionably "The Ultimate" in resilient, acrylic surfaces.

ACTION PAVE ACRYLIC WHITE LINE PAINT
Using the same special reinforcing pigments and pure silica sand that is found in our other coating, ACTION PAVE ACRYLIC WHITE LINE PAINT is the most durable, longest lasting line paint available.

 


 

Technical Specifications of Action Pave Acrylic Color Coating Products

 

Return to top


ACTION PAVE ACRYLIC CRACK & LEVELING BINDER PATCH

DESCRIPTION
A super durable acrylic emulsion mixed on site to repair cracks and level and fill low spots. It is a three (3) component bonding emulsion for correcting major and minor non-structural cracks and can smooth over and temporarily repair structural cracks. It is very effective in filling low spots in 1/4" to 1/2" lifts. Multiple applications will be required to achieve a smooth, surfacable repair.

USE
After cracks and low spots are thoroughly clean, apply ACTION PAVE ACRYLIC CRACK AND LEVELING BINDER PATCH to the areas of repair. This repair should be done and completed in its entirety before any other ACTION PAVE products are applied.

APPLICATION
Apply to cracks using a horseshoe squeegee and to low spots using an aluminum straight edge.

MIX DESIGN
A three (3) component emulsion which is mixed on site using a hand drill or mortar mixer consists of:

     1 part ACTION PAVE CRACK AND LEVELING BINDER PATCH
     2 parts dry silica sand (75-100 mesh)
     1/3 part portland cement

 

Mix the silica sand and cement thoroughly in a clean mortar mixer or container utilizing a power hand drill. Be sure cement is thoroughly mixed with the silica sand, removing all lumps. Then add ACTION-PAVE CRACK AND LEVELING BINDER PATCH with agitation. Mix until uniform. If the mix is too dry adjust by adding more ACTION PAVE CRACK AND LEVELING BINDER PATCH until a workable consistency is achieved.

NOTE: NEVER ADD WATER.

Upon completion of mixing apply material immediately. Clean up all mixing and application equipment immediately upon completion.

NOTE: MATERIAL SETS UP VERY RAPIDLY.

COVERAGE
Approximately six square feet per gallon of mixed emulsion at 1/4" depth. Approximately five linear feet per gallon of mixed emulsion at 1/2" width X 1/2" to 3/4" depth.

SURFACE PREPARATION AND APPLICATION
The surface for low spot patching must be clean and free of all dirt, debris and any film or mildew which may have accumulated due to the holding of water. Spread the mixed emulsion over the low spot using a squeegee, if size permits, floating the material into the low spot in 1/4" to 1/2" lifts. Allow material to dry thoroughly. Scrape and repeat process until desired level is achieved. Smooth surface and prepare it for ACTION PAVE ACRYLIC FILLER and FINISH coats.

The filling of cracks requires surface cracks to be thoroughly clean and dry. Squeegee with a horseshoe squeegee, filling to refusal. Multiple applications may be required. For structural cracks rout, air blow and thoroughly clean and dry. Fill to refusal using a horseshoe squeegee. Multiple applications will be required. After final application, scrape areas of repair thoroughly and make final repairs before applying ACTION PAVE ACRYLIC RESURFACER, FILLER or FINISH.

LIMITATIONS
• Do not apply ACTION PAVE ACRYLIC CRACK AND LEVELING BINDER PATCH when surface temperature is below 50°F (10°C) or when fog, rain or high humidity is imminent.

• Do not apply if surface temperature is above 130°F (55°C).

• Do not store in direct sunlight.

• Close covers tightly.

• Keep from freezing.

Return to top


ACTION PAVE® ACRYLIC RESURFACER

DESCRIPTION
ACTION PAVE ACRYLIC RESURFACER (concentrated acrylic resurfacing emulsion) is a heavy bodied, 100% acrylic emulsion developed specifically for use on open or pitted asphalt surfaces to reduce porosity and provide a uniform surface texture. Application of ACTION PAVE ACRYLIC RESURFACER provides an economical means for filling voids in asphalt pavements and protecting the asphalt from ultra-violet rays.

USE
Apply over newly paved surfaces or old, severely oxidized, pitted surfaces.

APPLICATION
Use a standard, commercial quality, squeegee 24", 30" or 36" in width, or spray apply product. Clean squeegee or sprayer with water immediately after use.

MIX DESIGN
ACTION PAVE ACRYLIC RESURFACER is concentrated and needs to be mixed on site with clean water. Thorough mixing is required. Mortar mixer offers best results.

     2 parts ACTION PAVE ACRYLIC RESURFACER
     1 part water

COVERAGE
The amount of material needed will vary slightly due to variation in density of the asphalt substrate and the technique of application. Approximate coverage ratio = twelve (12) square yards per gallon of concentrate.

SURFACE PREPARATION AND APPLICATION
The surface must be clean and free of grease, oil and any other foreign material. New asphalt shall cure a minimum of five (5) days and may require a longer curing period in cold or dry climate areas. Pour a ribbon of material along one end of the area to be surfaced. Spread evenly by walking in one direction and then reversing direction or spray product in same manner. Always maintain a wet edge and do not overwork material. Before applying the next coat of material, inspect coating and scrape off any ridges, lumps or other imperfections and then apply the next coat 90 degrees to this coat.

LIMITATIONS
• Do not apply ACTION PAVE ACRYLIC RESURFACER when surface temperature is below 50°F (10°C) or when fog, rain or high humidity is imminent.

• Do not apply if surface temperature is above 130°F (55°C).

• Do not store in direct sunlight.

• Close cover tightly.

• Keep from freezing.

Return to top


ACTION PAVE ACRYLIC FILLER COAT(S)

DESCRIPTION
100% acrylic emulsion, special reinforcing pigments and pure silica sand that provides a uniform and controlled texture which is extremely durable, however, remains flexible. ACTION PAVE ACRYLIC FILLER COAT(S) has been specifically engineered to protect asphalt and concrete surfaces from the harsh northeast weather conditions. Unlike other acrylic surfacing fillers, ACTION PAVE ACRYLIC FILLER is fully pigmented, resulting in longer lasting, richer, full depth color.

USE
Apply over existing color coated surfaces to rejuvenate and add texture. The ACTION-PAVE ACRYLIC FILLER coat(s) can be tailored to increase or decrease the speed of the surface. Apply over new surfaces which have had the ACTION PAVE ACRYLIC RESURFACER properly applied and cured.

APPLICATION
Use a standard, commercial quality, squeegee 24", 30" or 36" in width. Clean squeegee with water immediately after use.

MIX DESIGN
ACTION PAVE ACRYLIC FILLER is concentrated and needs to be mixed on site with clean water. Thorough mixing is required. Mortar mixer offers best results.

     2 parts ACTION PAVE ACRYLIC FILLER
     1 part water

COVERAGE
To surface the standard tennis court (800 square yards) a one (1) coat application will require 60 gallons of concentrated ACTION PAVE ACRYLIC FILLER. A two (2) coat application will require 115 gallons of concentrated ACTION PAVE ACRYLIC FILLER. A three (3) coat application will require 165 gallons of concentrated ACTION PAVE ACRYLIC FILLER. Approximate coverage ratio for a standard two (2) coat application = 7 square yards per gallon of concentrate.

SURFACE PREPARATION AND APPLICATION
The surface must be clean and free of grease, oil and any other foreign material. ACTION PAVE ACRYLIC FILLER coat is to be applied over previously color coated surfaces or new surfaces which have already had ACTION PAVE ACRYLIC RESURFACER applied. All crack repair and other preparation must be completed.

Spread ACTION PAVE ACRYLIC FILLER coat evenly by walking in one direction and then reversing direction. Always maintain a wet edge and do not overwork the material. Avoid leaving any puddles when squeegeeing material back and forth. Before applying the next filler coat, or the final finish coat, allow coating to dry sufficiently and inspect it. Scrape off any ridges, lumps or other imperfections and then apply the next coat.

LIMITATIONS
• Do not apply ACTION PAVE ACRYLIC FILLER coat(s) when surface temperature is below 50°F (10°C) or when fog, rain or high humidity is imminent.

• Do not apply if surface temperature is above 130°F (55°C).

• Do not store in direct sunlight.

• Close cover tightly.

• Keep from freezing.

Return to top


ACTION PAVE ACRYLIC FINISH COAT

DESCRIPTION
100% acrylic emulsion, special pigmented prime color reinforcing pigments that provide a super durable, long lasting finish coat to all surfaces. ACTION PAVE ACRYLIC FINISH coat has been specifically engineered to protect the entire ACTION PAVE ATHLETIC SURFACE SYSTEM from the ultraviolet rays of the sun and to cool the surface for more pleasurable play. Unlike other acrylic surfacing finish coats, ACTION PAVE ACRYLIC FINISH is fully pigmented, resulting in longer lasting, richer, full depth color.

USE
Apply over existing color coated surfaces where no additional texture is needed. Apply over ACTION PAVE ACRYLIC FILLER coat(s) to finish off the ACTION PAVE ATHLETIC SURFACING SYSTEM.

APPLICATION
Use a standard, commercial quality, squeegee or hair type applicating brush 24", 30" or 36" in width. Clean squeegee/brush with water immediately after use.

MIX DESIGN
ACTION PAVE ACRYLIC FINISH is concentrated and needs to be mixed on site with clean water. Thorough mixing is required. Mortar mixer offers best results.

     2 parts ACTION PAVE ACRYLIC FINISH
     1 part water

COVERAGE
To surface the standard tennis court (800 square yards) a one (1) coat application will require 55 gallons of concentrated ACTION PAVE ACRYLIC FINISH. A two (2) coat application will require 95 gallons of concentrated ACTION PAVE ACRYLIC FINISH. Approximate coverage ratio for a one (1) coat application = 15 square yards per gallon of concentrate.

SURFACE PREPARATION AND APPLICATION
The surface must be clean and free of grease, oil and any other foreign debris. ACTION PAVE ACRYLIC FINISH coat is to be applied over previously color coated or new surfaces which have already received ACTION PAVE ACRYLIC FILLER coat(s).

Spread ACTION PAVE ACRYLIC FINISH coat evenly by walking in one direction and then reversing direction. Always maintain a wet edge and do not overwork the material. Avoid leaving any puddles when squeegeeing material back and forth. Allow materials to dry sufficiently before applying the ACTION PAVE ACRYLIC WHITE LINE PAINT.

LIMITATIONS
• Do not apply ACTION PAVE ACRYLIC FINISH coat when surface temperature is below 50°F (10°C) or when fog, rain or high humidity is imminent.

• Do not apply if surface temperature is above 130°F (55°C).

• Do not store in direct sunlight.

• Close cover tightly.

• Keep from freezing.

Return to top


ACTION PAVE CUSHION AND SUPER CUSHION

DESCRIPTION
ACTION PAVE CUSHION is a highly resilient, rubberized coating consisting of encapsulated rubber particles and fillers, blended with 100% acrylic emulsion to provide a resilient, shock absorbing surface. (Three coat application.)

ACTION PAVE SUPER CUSHION is for those who demand only the best. It offers the ultimate in championship caliber resiliency. Formulated with varying gradations of granulated rubber particles suspended in 100% acrylic emulsion, ACTION PAVE SUPER CUSHION is super resilient to help reduce foot and leg fatigue, but durable enough to resist impact and gouging. (Five coat gradated rubber application.)

USE
Apply over new surfaces which have been coated with ACTION PAVE ACRYLIC RESURFACER or over previously color coated surfaces which never received a resilient cushion system.

APPLICATION
Use a standard, commercial quality, squeegee 24", 30" or 36" in width. Clean squeegee with water immediately after use.

MIX DESIGN
ACTION PAVE CUSHION and ACTION PAVE SUPER CUSHION are concentrated and need to be mixed on site with clean water. Thorough mixing is required. Mortar mixer offers best results.

2 parts ACTION PAVE CUSHION or SUPER CUSHION
1 part water

COVERAGE
To surface the standard tennis court (800 square yards) approximately 55 gallons of concentrated ACTION PAVE CUSHION or approximately 80 gallons of concentrated ACTION PAVE SUPER CUSHION is required. (These quantities are per coat.) The amount of material needed will vary slightly due to variation in density of the asphalt substrate and the technique of application. Approximate coverage ratio = 14 Square yards per gallon of concentrate for ACTION PAVE CUSHION and 10 square yards per gallon of concentrate for ACTION PAVE SUPER CUSHION.

SURFACE PREPARATION AND APPLICATION
The surface must be clean and free of grease, oil and any other foreign material.

ACTION PAVE CUSHION (three coat application): Pour a ribbon of material along one end of the area to be surfaced. Spread evenly by walking in one direction and then reversing direction. Always maintain a wet edge and do not overwork material. After thorough drying and before applying the next coat of material, inspect the surface and scrape off any ridges, lumps or other imperfections. Then apply the next coat at a 90° angle to the first one.

ACTION PAVE SUPER CUSHION (five coat application): Utilizing the larger gradated rubber particles of the SUPER CUSHION mix for the first three applications of this system, we create a rough rubber texture which is then filled and made uniform with two final coats of regular cushion material. The result is a very durable and highly resilient acrylic underlayment ready for the ACTION PAVE ACRYLIC COLOR SURFACE. Application procedures for this five (5) coat system are the same as for the three (3) coat system on the preceding page.

LIMITATIONS
• Do not apply ACTION PAVE CUSHION or SUPER CUSHION when surface temperature is below 50°F (10°C) or when fog, rain or high humidity is imminent.

• Do not apply if surface temperature is above 130°F (55°C).

• Do not store in direct sunlight.

• Close cover tightly.

• Keep from freezing.

Return to top


ACTION PAVE ACRYLIC WHITE LINE PAINT

DESCRIPTION
ACTION PAVE ACRYLIC WHITE LINE PAINT is an extremely durable 100% acrylic emulsion carefully formulated for use on tennis and basketball courts, running tracks and any other indoor or outdoor recreational surface. It offers a neat, clean, permanent line of marking. It is designed to be applied over all other ACTION PAVE products.

USE
Line and event markings for tennis and basketball courts, running tracks and all other indoor or outdoor recreational surface.

APPLICATION
Apply with a paint brush, roller or other suitable paint application equipment. Clean equipment with water immediately after use.

MIX DESIGN
ACTION PAVE ACRYLIC WHITE LINE PAINT is to be used as is. DO NOT ADD WATER.

COVERAGE
One gallon will be adequate to do one doubles tennis court.

SURFACE PREPARATION AND APPLICATION
The surface must be clean and free of grease, oil and any other foreign material. Apply as you would any other paint.

LIMITATIONS
• Do not apply ACTION-PAVE WHITE LINE PAINT when surface temperature is below 50°F (10°C) or when fog, rain or high humidity is imminent.

• Do not apply if surface temperature is above 130°F (55°C).

• Do not store in direct sunlight.

• Close cover tightly.

• Keep from freezing.

IMPORTANT NOTE
Allow lines to dry and cure for 24 hours before allowing any play on the new surface.

 

 

Copyright  2010 Copeland Coating Company, Inc. All rights reserved.